www.ArborSystems.com

Quick Links
Pointer controls HWA (PDF)
Detroit News on EAB (PDF)
Enews Signup
Direct-Inject Systems
Direct-Inject QC injector
QC Injection Tips
Conifer & Palm Kits
High-Volume Kit
Standard Kit
Parts Chart
Wedgle upgrade
Wedgle upgrade FAQ
Direct-Inject Chemicals
Pointer Insecticide
Greyhound Insecticide
Shepherd Fungicide
Whippet Fungicide
Mastiff PGR
Pinscher PGR
GreenTree Pro Nutriboosters
Iron Nutriboosters
Iron/Man Nutriboosters
Manganese Nutriboosters
PK Pro Nutriboosters
Direct-Inject How To
Preparing For Use
Injection Tip Options
Hardwoods
Conifers & Palms
Maintenance
Parts Chart
Complete Instruction Guide
How-To Videos
About Direct-Inject
Don't Drill...Direct-Inject
Maximize productivity
Tree anatomy
User testimonials
News • Events • Brochures
Read Enews
Enews Signup
Brochures / Flyers
Events calendar
Research/News
ArborSystems
Contact us
Distributor search
Legal information
EZ-Ject Herbicide System
www.EZJect.com
 
  Daily water flush
  When you are finished making injections for the day, flush chemical from your Wedgle Direct-Inject . This will prevent clogging or corrosion.
  1. Remove the chemical pack from the top QC coupler.
  2. Place the injection unit in a bucket of water until the top QC coupler is submerged.
  3. Squeeze the handles five times to flush out any remaining chemical.
  4. Remove injection tip.
  5. Replace dust caps on both QC couplers.
  Replace piston O-ring each spring
  At the beginning of each growing season, or if your injection unit has been unused for several months, replace the piston O-ring.

To replace the piston O-ring, use the screwdriver end of the multipurpose tool to unscrew the two piston connector rods (#26). Be careful not to lose the lever nuts from inside the handles (#28). Pull the piston assembly out of the handle, revealing the piston spring (#23) and the O-ring. Remove and replace O-ring using #13—the smallest O-ring in the parts kit.

Prior to reassembly, apply a small amount of lubricant, such as Vaseline® Petroleum Jelly, to the piston O-ring and piston rod. Carefully slide the piston assembly back into the barrel of the handle. Reattach the connector rods into the lever nuts. These parts are small and can take a little time to align properly. You can use a paper clip to help align the lever nut with the connector rod. Tighten the rods snugly, but do not over tighten.
  QC coupler O-ring maintenance
  QC coupler O-rings may be replaced if a coupler is not sealing correctly.

There is a large O-ring (#02) at the base of the top coupler and on the front of the main body. Use the multipurpose tool to remove the coupler from the injection body and replace the O-ring.

There is a medium-sized O-ring (#03) inside
each coupler. These can be replaced while the
coupler is attached to the body of the unit. Use
a paper clip to remove the old O-ring and to help
insert the new one.

For service assistance, contact your distributor
or call ArborSystems.
 
 
Tree Care Pro Log-In
Request password