www.ArborSystems.com

Quick Links
Pointer controls HWA (PDF)
Detroit News on EAB (PDF)
Free email newsletter
Why ArborSystems?
It's right for the trees
It's right for you
User testimonials
Direct-Inject Systems
Wedgle Direct-Inject
Wedgle accessories
Parts Charts
Direct-Inject Chemicals
Pointer Insecticide
Greyhound Insecticide
Shepherd Fungicide
Whippet Fungicide
Mastiff PGR
Pinscher PGR
Iron Nutriboosters
Iron/Man Nutriboosters
Iron Plus Nutriboosters
Manganese Nutriboosters
PK Pro Nutriboosters
Direct-Inject How To
How-to videos
Instruction guide
Preparing for use
Using the WDI system
Troubleshooting
Maintenance
Reassembly
Injection suggestions
FAQ
Glossary
News • Events • Research
Flyers
Events
Research/News
ArborSystems
Contact Us
Distributor search
Email newsletter
Legal information

EZ-Ject Herbicide System
www.EZJect.com
 
 
  A new piston O-ring should be installed each time the unit is assembled. Carefully insert the cap piece and piston assembly back into the barrel of the handle.

Reattach the connector rods into the lever nuts. These parts are small and can take time to line up properly. Sometimes it helps to push the paper clip into the lever nut to line it up with the connector rod. When tightening the rods with the screwdriver, make sure there is no play between the right and left handles. A little adjustment may be necessary. Tighten the rods snug, but do not overtighten.

Reassemble both check valve assemblies making sure the check valves are pointed in the correct direction.

For service assistance, contact your distributor
or call ArborSystems.


 
 
 
Tree Care Pro Log-In
Request password